A claim. With the proof attached.
In reviewPhotos, measurements and a site note. One connected work record.
A subcontractor work verification platform
Connect site evidence, quantity verification and QA/QC in one review trail—so your team knows what can be accepted and what stays on hold.
AI organizes the evidence. Your team makes every decision.
Example installation / Zone C
Structural decking installed across the submitted 200 m² area in Zone C. Photos and the measurement sheet are attached for review.
Photos, measurements and a site note. One connected work record.
Agree the scope and baseline before a pilot. Measure review time, accepted work coverage, first-pass approvals, missing-evidence returns and staff review hours.
01 / TWO LAYERS OF WORK VERIFICATION
Screwge helps contractors answer both questions before accepting subcontractor work and moving it toward billing and payment.
“How much was done?”
AI matches site evidence to claimed quantities and flags gaps. Your project team confirms what was completed.
“Was it done correctly?”
Your inspector checks drawings, specifications and inspection requirements. Failed work stays open for correction and reinspection.
Both checks before acceptance. Your team decides what can move forward. Unverified quantities and failed work stay on hold.
Floor 8 · Zone CBOQ 4.2.702 / SIMPLE IN THE FIELD
The people doing the work need a clear brief and a simple way to report it. Give them the scope, the location and the proof required.
Assigned work and evidence requirements, in context.
Photos, videos, voice updates, measurements and documents, linked to the same work item.
Quantity verification, QA/QC pending, passed or returned for correction—with a reason.
03 / THE ACCEPTED WORK RECORD
Claimed quantity. Verified quantity. Quality results. Contractor acceptance. One record connects the evidence and decisions to the supporting bill line.
MERIDIAN TECH PARK PROJECT RECORD / 07Meridian Tech Park · Zone C · BOQ 4.2.7
Summit Steel Fabricators
160 m² accepted160 m²×₹1,500 / m²
A record of a specific reviewed quantity and the evidence behind its acceptance. It connects the work item, location, claimed and accepted quantities, inspection context, decision-maker and supporting bill line.
Your site engineers, internal QA/QC team or external inspectors check work against drawings, specifications and inspection requirements. External reviewers only access their assigned work. Failed work returns for correction and reinspection; your contractor accepts the eligible portion.
No. AI helps match evidence to work packages, estimate physical progress and completed quantities, organize proof, and flag missing or inconsistent evidence. The project team confirms the quantity; qualified inspectors check quality. Authorized people make acceptance, contractual, certification and payment decisions.
An inspector records a fail and raises a defect or NCR. The subcontractor corrects the work and submits it for reinspection. That portion stays outside accepted work until the required quality checks pass and the contractor accepts it. A scope variation is handled separately.
Screwge focuses on the work verification that happens before commercial certification. Your existing systems can remain the place for accounting and payment. Any integration needs are agreed as part of the pilot.
No. Verified quantity plus passed quality checks makes work eligible for contractor acceptance. Accepted work supports billing; payment readiness also depends on required invoices, compliance, variations and commercial approvals. Final payment authorization remains with the contractor. Screwge does not transfer contractor payments.